Free Web Hosting by Netfirms
Web Hosting by Netfirms | Free Domain Names by Netfirms

 

Canot de Charles' Canoe - C1 Marathon 

Design: Bear Mountain par/by Steve Killing

 Mise à jour:

Last update:

05/14/2005

 

Pose des lattes/Planking

Ville / Location FAQ

 

Home
Table / Strong Back
Moule / Forms & set-up
Étrave / Stem
Lattes / Planks
Pose des lattes/Planking
Ailes / Wings
Fibre de verre/Fiberglass
C1 Terminé / Completed
Freedom 17
Contact

 

                   Photos / Pictures

 

Français

 

bulletLa première latte fut posée à partir de l'arrière, le long de la ligne du rebord jusqu'à la station 3. Ensuite nous avons continué tout droit. Il faudra remplir un espace jusqu'à la pointe.
bulletLes courbes sont si prononcées entre les stations 10, 10.5 et 11 que pour faciliter la pose,  les 6 premières lattes furent pliées en (s) à l'aide d'un fer de luthier.
bulletLes lattes 7,8,9,10 furent facile à poser toutefois, il a fallu resortir le fer pour recourber et tordre les lattes de 11 à 15 entre les stations 11.5 et 13 afin de faciliter la pose. À partir le la latte 16 l'installation n'est pas plus difficile que pour un canot standard.
bulletNous opérons la pose toujours à deux et avec l'aide d'une quarantaine de pinces à ressort. Parfois nous avons l'impression qu'il nous manque de mains ou de pinces.
bulletÀ partir de la latte 14 nous avons passé par dessus les ailes ou les cornes et laissé une ouverture à partir de la station # 10.5 jusqu'à la station 17. Nous allons remplir les pointes plus tard.

English

 

bulletThe first plank was installed from the rear of the boat and follwing the shear line up to station 3. Then we let the plank go straight ahead. A small space up to the tip of the boat will have to be filled up.
bulletThe curves are so pronounced between station 10, 10.5 and 11 that, to facilitate the installation, the first 6 planks were given a (s) shape on a luthier's bending iron before they were stapled on.
bulletPlanks # 7,8,9,and 10 were very easy to install however, we had to get the bending iron out again for plank 11 to 15. It required bending and twisting between station 11.5 and 13. From plank # 16 on, planking is of the same difficulty as for a standard canoe.
bulletWe always operate as a duo and with the help of about 40 spring clamp. Nevertheless, we sometime feel that we don't have enough hands or clamps.
bulletFrom plank 14 we went over the wing and left a hole from station 10.5 to 17. It will be filled later.

Photos

 

img_2746_1.jpg (26195 bytes)  img_2747_1.jpg (53073 bytes)  img_2748_1.jpg (75025 bytes)  img_2749_1.jpg (61479 bytes)  img_2752_1.jpg (48449 bytes)  img_2756_1.jpg (48946 bytes) 

img_2764_1.jpg (63369 bytes)  img_2765_1.jpg (57196 bytes)  img_2770_1.jpg (74288 bytes)  img_2775_1.jpg (38771 bytes)  img_2778_1.jpg (62289 bytes)  img_2779_1.jpg (39664 bytes)

img_2778_1.jpg (62289 bytes)  img_2781_1.jpg (67844 bytes)  img_2782_1.jpg (63531 bytes)  img_2783_1.jpg (47781 bytes)  img_2786_1.jpg (68529 bytes)  img_2791_1.jpg (61775 bytes)

img_2792_1.jpg (61353 bytes)  img_2795_1.jpg (68748 bytes)  img_2831_1.jpg (48101 bytes) img_2832_1.jpg (56311 bytes)   img_2895_1.jpg (66111 bytes)  img_2897_1.jpg (77757 bytes)  

Haut Up

 

 

 

 Back Home Next